LRT Shah Alam Line



About LRT Shah Alam Line

The LRT Shah Alam Line (LRT3) is a medium-capacity light rail line serving the Shah Alam and Klang regions. It was previously known as the LRT Bandar Utama–Klang Line or LRT Johan Setia Line. It will be the third LRT line, and the fourth fully automated and driverless rail system in the Klang Valley region.

The Line currently has 25 permanent stations under construction, five of them being kept as provisional stations (*) for the future.

According to The Edge Malaysia on 22 June 2026, the LRT3 Shah Alam Line, which serves Shah Alam and its surrounding areas, will officially begin operations on Monday, 29 June 2026.


Stations in LRT Shah Alam Line

Bandar Utama
Kayu Ara
BU 11
Tropicana*
Damansara Idaman
Subang
Glenmarie 2
Temasya*
Kerjaya

Stadium Shah Alam
Dato Menteri
Raja Muda*
UiTM Shah Alam
Seksyen 7 Shah Alam
Bukit Raja Selatan*
Bandar Baru Klang
Pasar Klang

Jalan Meru
Jambatan Kota
Taman Selatan
Seri Andalas
Klang Jaya
Bandar Bukit Tinggi
Bandar Botanik*
Johan Setia



folder_open   Main