Chow Kit Monorail Station
About the Station
Chow Kit Monorail Station is an elevated monorail train station that forms a
part of the Kuala Lumpur Monorail (KL Monorail) line located in Kuala Lumpur
and opened alongside the rest of the train service on August 31, 2003.
The station, the second last KL Monorail station before the Titiwangsa
terminus, is located and named after the district of Chow Kit, over the
meeting point of the southern ends of Jalan Pahang and Jalan Ipoh, and the
northern end of Jalan Tuanku Abdul Rahman. The monorail line continues down
Jalan Tuanku Abdul Rahman until the Sultan Ismail turnoff, turning toward
the east.
The RapidKL buses routes radiating out from Chow Kit KL Monorail station
with connecting City shuttles, Trunk shuttles, Local shuttles and Express
buses towards various location in northern part of city.
• Side Platform |
• Ticket Vending Machine |
Entrances and Exit
Chow Kit Monorail Station has 2 signed entrances / exits. The
Chow Kit Station is also within walking distance from various business
offices and hotels around this area.
Entrance | Location | Destination |
---|---|---|
A | West Side | Jalan Tuanku Abdul Rahman (North End) |
B | East Side | Jalan Raja Muda Abdul Aziz |
Around the Station
Within walking distance from this Station, you can find this:
• Kuala Lumpur Women & Children Hospital
• General Hospital Kuala Lumpur
•
BSN Chow Kit Branch
•
Grand Seasons Hotel, Kuala Lumpur
Platform Architecture
Chow Kit Monorail Station's layout is different from other KL
Monorail Line stations. The Station has three levels: The access points at
street level, and the ticket area and adjoining platforms on two elevated
levels. All levels are linked via stairways, escalators and elevators
designated for disabled passengers.
The Station's side platform is used by trains travelling at
either direction of the line, and is entirely sheltered by roofs.
Station Information
Station ID | MR10 |
Address | Jalan Pahang & Jalan Ipoh Junction, Kuala Lumpur |
Lines | KL Monorail |
Platforms | 2 Side Platforms |
Tracks | Dual Tracks |
Parking | Unavailable |
Tickets | Ticketing Counters & Vending Machines |
First Train | 06.00 am |
Last Train | 11.30 pm (KL Sentral towards Titiwangsa) |
Last Train | 11.50 pm (Titiwangsa towards KL Sentral) |
folder_open KL Monorail Line