Dang Wangi LRT Station


Dang Wangi LRT Station
Dang Wangi LRT Station
Dang Wangi LRT Station
Dang Wangi LRT Station
Dang Wangi LRT Station
Dang Wangi LRT Station
Dang Wangi LRT Station
Dang Wangi LRT Station
Dang Wangi LRT Station
Dang Wangi LRT Station

About the Station

Dang Wangi LRT Station is an LRT station in Kuala Lumpur that served by RapidKL's Kelana Jaya Line. Dang Wangi Station is underground station located and named after Jalan Dang Wangi, Kuala Lumpur.

The Station was opened on 1 June 1999, as part of the line's second segment encompassing 13 stations between Masjid Jamek Station and Gombak Station and an underground line. The Dang Wangi LRT Station is one of five underground stations in the Kelana Jaya Line.

The access point to Dang Wangi LRT Station is situated on the northeastern tip of Jalan Ampang, with Bukit Nanas directly across the road and the Klang River behind the Station. The Station's name, Dang Wangi, is derived from Jalan Dang Wangi, a road that intersects with Jalan Ampang 100 metres south. Dang Wangi LRT Station are located close to the Capital Square mixed development.

The Station is primarily intended to serve the northeastern region of central Kuala Lumpur, as well as several office buildings northwards along the road towards the Golden Triangle, the latter additionally provided with Kuala Lumpur Monorail stations after 2003.

Station Facilities

• Island Platform
• Escalator & Lift
• Public Toilets
• KL Monorail Interchange

• Ticket Vending Machine
• Customer Service Office
• Drinks Vending Machine
• Shops

Interchange Station

The Dang Wangi Station is located less than one kilometer west from the Bukit Nanas Monorail Station, also located beside Bukit Nanas. Despite the distance, official transit maps designate both Stations as an interchange station between the Kelana Jaya Line and the Kuala Lumpur Monorail. Passengers need to tap out from one line when changing between the two lines.

Accordingly, passengers who intend to switch to either lines must walk along Jalan Ampang to reach either stations. Canopies along sidewalks were erected between the stations. An overhead footbridge with escalators directly in front of the Dang Wangi LRT Station, which crosses Jalan Ampang was also constructed to provide convenience to the pedestrian.

Entrances and Exits


The Station has only one entry and exit point from street level, adjoining a massive low-rise structure behind the vestibule.

Entrance Location Destination
A   Street level access. South side of Jalan Ampang

Platform Architecture

The Dang Wangi LRT Station, like all other underground Kelana Jaya Line stations, is of basic construction consisting of only three levels: the entrance level at street level, and the concourse and platform levels underground. All levels are linked via escalators and stairways, while elevators are additionally provided between the concourse level and the platform level. The Station contains only one island platform for two tracks of opposite directions, with floor-to-ceiling platform screen doors sealing the platform from the tracks.

Station Information

Station ID  KJ12 
Address Jalan Ampang, Kuala Lumpur
Lines Kelana Jaya Line
Platforms Single Island Platform (Underground)
Tracks Dual Tracks
Parking Not Available
Tickets Ticketing Counters & Vending Machines
Station Open 06:00 am
Station Closed 11:55 pm (Mon - Sat) / 11:30 pm (Sunday & PH)
Last Train to Gombak 12:19 am (Mon - Sat) / 11:50 pm (Sunday & PH)
Last Train to Putra Height 12:00 am (Mon - Sat) / 11:42 pm (Sunday & PH)
Interchange MR8 Bukit Nanas Monorail Station


folder_open   Kelana Jaya Line